Experience


Our recent accomplishments:


 

Intranet portal deployment with an integrated project management system.
Industry:

 

Power Industry

 

Products:

 

Microsoft Office SharePoint Server 2007 and Microsoft Office Project Server 2007

 

Description: The project included the deployment of the Microsoft Office SharePoint Server 2007 and the Project Server 2007 in a server farm environment, as well as the migration of our client’s data from the previously used versions of these products (respectively WSS 2.0 and Project Server 2003). Because of the plan to use the platform as the corporate website and a significant increase in the number of the users served, the project required a long and detailed planning/analysis phase (both functional and dysfunctional). The main identified requirements were:
  • Ensuring a high availability of the system
  • Ensuring a high scalability of the system (the initial number of users was 1500 and could double)
  • Adjusting the Project Server 2007 to cover the TenStep methodology requirements
The deployed system consisted of: two Front-End servers connected with an NLB node, four application servers (two of which run the Project Server application) and a Microsoft SQL 2005 installed in a two node cluster. All servers in the farm (except for SQL) were virtualized. Such architecture allowed to meet all the non-functional requirements, and with a proper configuration and adjustment of the SharePoint and Project Server services – the functional requirements were covered as well.

 


 

Implementation of intranet portal.
Branża:

 

Motor Industry

 

Products:

 

Microsoft Office SharePoint Server 2007 Enterprise

 

Description: Our client’s aim was to launch a corporate intranet portal. All the information within the organization was to be put in one central location and provide easy access to all the employees – enabling an increase in their work efficiency and accelerate the information seeking process. The key requirements were:
  • designing and creating a web site structure
  • adjusting the portal look to the graphic scheme used in the company
  • running the search service
  • implementing electronic forms to support key business processes
In order to meet the customer’s requirements a properly implemented and configured Microsoft Office SharePoint Server 2007 farm has been used. During the project the functions from the Enterprise MOSS 2007 edition were employed, such as the search service, portal sites and the Form Server.

 


 

Project management system implementation.
Branża:

 

Insurance

 

Products:

 

Microsoft Office Project Server 2007

 

Description: Deployment covered the installation and full configuration of the server farm designed to enable a complex project and time management in client’s organization. The project server configuration included:

timesheet adjustment

configuration of a coherent project status report template

modifications of the draft projects template